Unscheduled:
* August 28th: There was an outage on SUNET west green affecting the redundancy towards Mälardalens Högskola. The issue was a faulty card in a transmission node.
* August 26th: There was an outage on the north red network caused by equipment failure on a node in Uppsala. 

Scheduled:
* August 25th: Two transponder cards were replaced in transmission nodes in Västerås.
* August 23rd: A service affecting work was carried out in order restore the management on a node in Växjö.
* August 1st: An emergency maintenance was performed on the south red network to troubleshoot recent issues tracked in SUNETTICKET-1433.
{div}
div

Unscheduled:

  • August 28th: There was an outage on SUNET west green affecting the redundancy towards Mälardalens Högskola. The issue was a faulty card in a transmission node.
  • August 26th: There was an outage on the north red network caused by equipment failure on a node in Uppsala. 

Scheduled:

  • August 25th: Two transponder cards were replaced in transmission nodes in Västerås.
  • August 23rd: A service affecting work was carried out in order restore the management on a node in Växjö.
  • August 1st: An emergency maintenance was performed on the south red network to troubleshoot recent issues tracked in SUNETTICKET-1433.

    Scope

    Unscheduled

    Scheduled

    Total

    Hardware

    2 pcs 3d 21:19

    2 pcs 02:50

    4 pcs 4d 00:09

    Link

    0 pcs

    1 pcs 00:06

    1 pcs 00:06

    None

    0 pcs

    0 pcs

    0 pcs

    Routing

    0 pcs

    0 pcs

    0 pcs

    Software

    0 pcs

    0 pcs

    0 pcs