Unscheduled: - June 25th: We noticed a short downtime on the West Red network. The reason for the outage was a Telenor fiber issue near Örebro. A longer outage was later seen when fiber splicing took place.
- June 25th: The red link access fiber to Linköpings Universitet was cut by an excavator, the fiber was repaired.
- June 22nd: The An outage between Kiruna and Luleå was caused by a damaged fiber pair. Our circuit was moved to another fiber pair and the service was restored.
- June 20th: After the maintenance in SUNETTICKET-1968 the The red link to KTH did not come back up after a planned maintenance. The reason was a broken transponder card which was changed with a new working one.
- June 18th: There was an outage on the stretch between Luleå and Kiruna between 06:13 - 06:24 UTC.
The reason for this outage was our provider started to do a measurement and thought the link was protected. When When they noticed it wasn't was not protected they aborted the measurement. - June 14th: There was an outage caused by an unannounced planned maintenance in Uppsala.
- June 12th: E-VPN service between Fränsta and Stockholm was down due to a power outage.
- June 3rd: An unannounced planned maintenance caused outages on the North Red network between Gävle and Hoforshus.
- May 30th: There was a brief outage on the red link between SUNET and CTH. No RFO could be found.
Scheduled: - June 28th: A transmission node was in Västerås was upgraded, ; the upgrade process was prolonged due to software and hardware incompatibility's when exchanging cards and flash.
- June 20th: One of the routing-engines in router m1tug.sunet.se was upgraded in order fix snmp anomaliesSNMP abnormalities.
- June 18th: Our provider performed a planned fiber maintenance on the green network in Göteborg.
- June 14th: There was a planned fiber maintenance in Göteborg that affected CTH and GU.
- June 6th: There was a A planned SUNET router software upgrade was performed.
- June 5th: Maintenance was performed to restore management to a transmission node in the South Green network.
- June 4th: There was planned Planned software upgrade of the transmission nodes in the South Green network was performed.
- June 3rd: Our supplier has performed fiber work on the stretch between Luleå and Kiruna.
|
Scope | Unscheduled | Scheduled | Total |
---|
Hardware | 1 pcs 02:20 | 2 pcs 06:23 | 3 pcs 08:43 |
---|
Link | 4 pcs 19:07 | 2 pcs 00:07 | 6 pcs 19:14 |
---|
None | 4 pcs 2d 00:32 | 1 pcs 04:19 | 5 pcs 2d 04:51 |
---|
Routing | 0 pcs | 0 pcs | 0 pcs |
---|
Software | 0 pcs | 3 pcs 01:02 | 3 pcs 01:02 |
---|
|