Unscheduled: - March 4th: There was one minute outage in the North Red network between Boden and Åkroken, caused by human error on site.
Scheduled: - March 27th: A transmission card was changed in a transmission equipment in Tuggen.
- March 26th: Supplier performed an OTDR measurement between Boden and Åkroken.
- March 24th: Supplier performed fiber maintenance on the West Green network in Göteborg.
- March 22nd: We replaced a broken card in a transmission equipment on the red network.
- March 21st: Supplier performed a planned OTDR measurement between Boden and Luleå.
- March 20th: A planned maintenance to move some equipment to UPS/generator power at LNU was performed.
- February 28th: Planned maintenance was performed by SUNET's fiber supplier on the stretch between Boden and Åkroken.
| Wiki Markup |
---|
{div}
Unscheduled:
* March 4th: There was one minute outage in the North Red network between Boden and Åkroken, caused by human error on site.
Scheduled:
* March 27th: A transmission card was changed in a transmission equipment in Tuggen.
* March 26th: Supplier performed an OTDR measurement between Boden and Åkroken.
* March 24th: Supplier performed fiber maintenance on the West Green network in Göteborg.
* March 22nd: We replaced a broken card in a transmission equipment on the red network.
* March 21st: Supplier performed a planned OTDR measurement between Boden and Luleå.
* March 20th: A planned maintenance to move some equipment to UPS/generator power at LNU was performed.
* February 28th: Planned maintenance was performed by SUNET's fiber supplier on the stretch between Boden and Åkroken.
{div} |
Scope | Unscheduled | Scheduled | Total |
---|
Hardware | 0 pcs | 2 pcs 02:15 | 2 pcs 02:15 |
---|
Link | 0 pcs | 5 pcs 14:47 | 5 pcs 14:47 |
---|
None | 1 pcs 00:01 | 0 pcs | 1 pcs 00:01 |
---|
Routing | 0 pcs | 0 pcs | 0 pcs |
---|
Software | 0 pcs | 0 pcs | 0 pcs |
---|
|