201211 - Public report
201211 - Public report
Unscheduled:
- November 23rd: There was a fiber break causing an outage on DU's red li=
nk.
- November 22nd: During a site in=
tervention (SUNETTIKCET-2198) there was an outage on the terminating circui=
ts in Link=C3=B6ping. The outage was caused by a miscommunication of the wo=
rk scope between NUNOC and the supplier.
- November 21st: A fiber break in Sundsvall caused outages on SUNET's cor=
e and MIUN's redundancy.
- November 12th: The link between SUNEt routers m1fre and gu-br1 suffered=
an outage which caused loss of redundancy to GU as their green network con=
nection was affected. The reason for the outage was a bad patch cable =
in the supplier's sub-carrier's equipment.
- November 7th: An outage was noticed on the link between Stockholm and N=
arvik. The reason was a cut power cable to the site in Abisko.
Scheduled:
- November 26th: A faulty card (1=
-B-3) has been replaced on transmission equipment located at KTH.
- November 26th: A planned fiber maintenance between V=C3=A4xj=C3=B6 and =
=C3=84lmhult was performed to resolve a degraded signal issue.
- November 22nd: Planned maintenance was performed on the South Green net=
work between Link=C3=B6ping and Sundhultsbrunn in order to troubleshoot sig=
nal quality issues.
- November 20th: Planned maintenance was performed to replace the patchin=
g for the SP red link in SUNET's PoP in Bor=C3=A5s.
- November 8th: A planned maintenance to replace a controller card on one=
of our transmission equipment in Stockholm was performed successfully.
- November 6th: A NORDUnet router=
was upgraded to a newer software version, affecting OSO's connection to JI=
VE.
- November 4th: Carrier performed fiber maintenance in G=C3=B6teborg.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
4 pcs 00:30 |
4 pcs 00:30 |
Link |
5 pcs 1d 04:15 |
3 pcs 03:34 |
8 pcs 1d 07:49 |
None |
0 pcs |
0 pcs
=
td>
| 0 pcs
=
td>
|
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |