201201 - Public report
201201 - Public report
Unscheduled:
- January 30th: An unannounced fibre maintenance in Halmstad caused an ou=
tage oh HH's green uplink to SUNET.
- January 24th: A faulty card on transmission equipment at KTH caused mul=
tiple outages.
- January 23rd: There was an outage in the link towards VR caused by a of=
routing protocol failure.
- January 19th: A transmission node restart caused an outage on one of th=
e SUNET core links between Kalix and Stockholm.
- January 18th: There was a short flap on the south green network caused =
by human error during another intervention at our site in V=C3=A4xjo.
- January 17th: There was an outage on the red link between SUNET and UMU=
caused by a damaged fiber.
- January 16th: There was an outage between SUNET and TDC in Stockholm.=
li>
- January 10th: There was a routing problem for SMHI caused by a configur=
ation mistake.
- January 3rd: There was an outage on the south red network affecting the=
redundancy to BTH, HKR, KAU, LU and MAH. The cause was miscommunication be=
tween our supplier and their contractor who measured two fibers instead of =
just the one which had been scheduled.
- December 26th: Router issues caused an outage on MDH's green network.=
li>
- December 21st: Interfaces restarted on one of the SUNET routers at BTH,=
causing a short outage on their red uplink.
- December 21st: Fibre issues in G=C3=B6teborg caused a short outage on C=
TH's green network.
Scheduled:
- January 31st: Service affecting work was performed on the transmission =
network in order to restore management to a node in Sundsvall.
- January 29th: Our supplier performed reconnection of circuits in G=C3=
=B6teborg.
- January 25th: A planned intervention was performed to fix the issues fo=
llowing a fiber break in Vindeln.
- January 25th: proj.sunet.se has been moved to another server.
- January 23rd: A planned maintenance was performed to replace a broken F=
PC in one of the routers in Stockholm.
- January 20th: The green edge router at MDH was upgraded to a newer soft=
ware version.
- January 19th: The SiteVision CMS was updated to the latest version.
- January 18th: The optical equipment at the site in Hakkas was moved to =
a new location.
- January 12th: Our supplier performed a planned measurement on a fiber b=
etween Kalmar and Bergskvara.
- January 11th: Our provider was supposed to perform fiber measurement on=
the south green network that they failed to do but they found and replaced=
a bad patch which was causing a degraded signal in that fiber stretch.
- January 3rd: There was a maintenance aimed at fixing a degraded signal =
issue. The maintenance was unsuccessful.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
1 pcs 00:02 |
3 pcs 01:12 |
4 pcs 01:14 |
Link |
7 pcs 1d 01:26 |
5 pcs 14:46 |
12 pcs 1d 16:12 |
None |
4 pcs 1d 07:14 |
1 pcs 00:10 |
5 pcs 1d 07:24 |
Other: DNSsec |
0 pcs |
0 pcs |
0 pcs |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
2 pcs 00:18 |
2 pcs 00:18 |
Total on=C3=A5barhet f=C3=B6r redundant anslutna kunder: 1180 minuter.=