Date: Thu, 28 Mar 2024 12:47:01 +0000 (GMT)
Message-ID: <62720184.370.1711630021308@de3edcefd069>
Subject: Exported From Confluence
MIME-Version: 1.0
Content-Type: multipart/related;
boundary="----=_Part_369_168290593.1711630021308"
------=_Part_369_168290593.1711630021308
Content-Type: text/html; charset=UTF-8
Content-Transfer-Encoding: quoted-printable
Content-Location: file:///C:/exported.html
202106 - Public report
202106 - Public report
Unscheduled:
- June 28th: The links between Kalmar - Bergkvara and Bergkvara - Karlskr=
ona went down due to power outage at provider site.
- June 21st: One of the link to SMUS got decommissioned
- June 13th: FPC 10 reported major errors in ume8-r1 provoking another fl=
ap on the link towards umu-r1. FPC is replaced.
- June 9th: FPC 10 was reporting major errors in ume8-r1 and had to be re=
booted.
- June 2nd: Connection lost to several RISE CPEs in G=C3=B6teborg -
gbg-c2, gbg-c4, gbg-c5 and gbg-c6 - due to a short outage at the provider's=
network.
Scheduled:
- June 28th: Supplier performed fiber maintenance that affected the conne=
ction to RISE Stora Gatan 36, V=C3=A4ster=C3=A5s.
- June 20th: Provider performed a routine cable work. This affected the l=
ink between Oslo and Trondheim
- June 17th: Supplier performed cabling changes that will affect the link=
between
Varla - Holmag=C3=A4rde.
- June 15th: Fiber provider performed fiberwork in Smedby that will affec=
t the link between Kalmar - Bergkvara.
- June 14th: Provider performed a rerouting maintenance that affected the=
link between tug-r1 - mdh-r2.
- June 10th: The router mcen1-r1 in Malm=C3=B6 was upgraded to a newer so=
ftware release.
- June 9th: Fiber provider performed fiber maintenance that affected the =
connection between SUNET and SMHI.
- June 9th: Planned maintenance to change to new fiber between bos-r1 - b=
os-c1.
- June 8th: The core router in Stockholm (sthb-r1) was upgraded to a newe=
r software release.
- June 2nd: We performed a hardware maintenance to replace optics in CPE =
bos-c2.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
0 pcs |
0 pcs |
Link |
3 pcs 02:04 |
7 pcs 13:56 |
10 pcs 16:00 |
None |
2 pcs 02:12 |
2 pcs 03:28 |
4 pcs 05:40 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
1 pcs 00:31 |
1 pcs 00:31 |
------=_Part_369_168290593.1711630021308--