Date: Tue, 19 Mar 2024 03:37:19 +0000 (GMT)
Message-ID: <785172269.1743.1710819439901@b10ee07c930b>
Subject: Exported From Confluence
MIME-Version: 1.0
Content-Type: multipart/related;
boundary="----=_Part_1742_1577711313.1710819439900"
------=_Part_1742_1577711313.1710819439900
Content-Type: text/html; charset=UTF-8
Content-Transfer-Encoding: quoted-printable
Content-Location: file:///C:/exported.html
202101 - Public report
202101 - Public report
Unscheduled:
- January 25th: There was an outage on the fiber between KVG11 (Kongsving=
er) and GAUS23 (Oslo) due to an announced maintenance.
- January 25th: There was an outage on the link towards Riksarkivet in Ar=
kivgatan 9A in G=C3=B6teborg.
- January 24th: Power outage at the site initially caused router to go do=
wn. After power was back, FPC did not work as expected and had to be replac=
ed. FPC was replaced and the reachability to the router was restored.
- January 19th: Backbone link between fsn2-r1 - sthb-r1 was down due to a=
faulty FPC. The broken FPC has been replaced.
- January 15th: Maintenance to investigate bit errors, fault isolated to =
CFP in tug-r1.
- January 13th: The Link between SUNET and DDB was down after a planned m=
aintenance performed by the circuit provider. The issue has now been resolv=
ed.
- January 12th: The link between SUNET (STHB) and KI was down. RFO not fo=
und.
- January 12th: The link towards Riksarkivet in Ramsele was down. Provide=
r troubleshooted, circuit came up without being able to identify any fault.=
- January 11th: The NNI connection between SUNET and TELE2 in Sundsvall f=
lapped due to a restart of the provider's router interface.
- January 11th: The link to Riksarkivet in Fr=C3=A4nsta was down. Provide=
r troubleshooted, circuit was up without being able to identify any fault.<=
/li>
- January 10th: The link between SUNET and Polarforskningssekretariatet A=
bisko was down on several occasions on the night from 10.01.2020 to 11.01.2=
020. This was due to a planned maintenance by carrier.
Scheduled:
- January 25th: Provider performed fiber maintenance in Kiruna.
- January 25th: SUNET checked the fiber patch connecting our amplifiers i=
n site HAB3, Hallsberg.
- January 24th: Supplier performed cable maintenance.
- January 12th: Carrier performed a planned fibre maintenance outside Kal=
ix.
- January 11th: Tele2 performed a central hardware upgrade.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
2 pcs 2d 07:48 |
0 pcs |
2 pcs 2d 07:48 |
Link |
6 pcs 1d 06:40 |
3 pcs 03:17 |
9 pcs 1d 09:57 |
None |
3 pcs 07:13 |
2 pcs 07:39 |
5 pcs 14:52 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |
------=_Part_1742_1577711313.1710819439900--